Saudi Arabia
2022
NEOM’s Coastal Temporary Water Supply Project, covers the provision of Engineering, Procurement, Construction and Commissioning Services for the Water Transmission system enabling delivery of 44000 m3/day Bulk Desalinated Water through interconnection with Sharma-HPR pipeline near Sharma Station to the Western Core Development area for construction
Project facilities include: Around 71.5 Km of HDPE pipeline network of different, sizes (22.1 KM of OD400, 25.9 KM of OD630 and 23.5 KM of OD900 HDPE pipe), Two (2) Demand centers each with 5000m3 storage capacity (5000 m3 storage Tank), Three (3) Tanker filling stations, One (1) pumping station
Aktech ScopeDetailed Design & Engineering, Procurement Support, Construction Support